Maharashtra State Electricity Distribution Co. Ltd.
BILL OF SUPPLY FOR THE MONTH OF May 2025
000002909938682
GSTIN: 27AACCT0294J2ZS HSN CODE: 27160000
THANE DF CIRCLE :602 THANE DF DIVISION : 608 KALWA S/DN. : 128 1
Consumer No. : 000020480408  
Consumer Name : SMT ASHA NANA PATIL
Adresss : SHOP NO 1 SWAPNA SHILP NEAR WADAPAV CENTER OLD
  M P ROAD KALWA
Village : Pincode : 0
     
BILL DATE 09-06-2025 50,890.00
DUE DATE 30-06-2025
IF PAID UPTO 18-06-2025 50,480.00
IF PAID AFTER 30-06-2025 51,530.00
Last Receipt No./Date /23-05-2025
Last Month Payment 48,300.00
Scale / Sector Large Scale /Private Sector
Email ID : san*********@icicibank.com Activity :
Mobile No. : 79******31 Meter No.: 055-55500485 Seasonal : N Load Shed Ind :  
Tariff : 70 LT-II B Connected Load (KW): 25.00 KW Urban/Rural Flag : U Express Feeder Flag : N
Contract Demand (KVA) : 31.25 40% of Con. Demand(KVA) : 12.50 Feeder Voltage (KV) : 11 LIS Indicator  :  
Sanctioned load (KW) : 25.00 KW            
DTC : 9128130 PC-MR-ROUTE-SEQ :   00-40-3004-1051 BU : 4261 PC : 00
Date of Connection : 08-10-2010 Category : LT COMM 20 TO 50KW GSTIN :
Supply at : LT Elec. Duty : 06 PAN :
Prev. Highest (Mth) : Prev. Highest Bill Demand (KVA) :
Security Deposit Held Rs. : 39,175.65 Addl. S.D. Demanded Rs : 00.00
Bank Guarantee Rs. : 0.00 S.D. Arrears Rs. : 55,310.00
BILLING HISTORY
Bill Month Consumption (Units) Bill Demand (KVA) Bill Amount
Apr 2025 2,395 13 48,863.83
Mar 2025 2,153 13 45,998.88
Feb 2025 1,828 13 40,228.09
Jan 2025 1,815 13 40,738.91
Dec 2024 1,708 13 40,861.06
Nov 2024 1,631 13 39,089.60
Oct 2024 2,106 13 48,230.47
Sep 2024 1,753 13 41,794.20
Aug 2024 2,002 13 46,286.16
Jul 2024 1,973 13 45,656.66
Jun 2024 2,372 13 53,372.64
May 2024 2,897 13 63,018.79
CUSTOMER CARE Toll Free No.
02522-677099
02522-352255
1800 267 7099
connect.smk@torrentpower.com
Rule & Procedure for Consumer Grievances Redressal is available at www.mahadiscom.in>consumer portal>CGRF Instead of Printed bill , register for E-bill and avail Rs. 10 per bill as a “Go-green “ discount.For registration visit at www.mahadiscom.in->consumer portal->Quick access->Go-green request

Scan this QR Code with BHIM App for UPI Payment

For making Energy Bill Payment through RTGS/NEFT mode, use following details
  • Beneficiary Name: Torrent Power Limited
  • Beneficiary Account Number: TSZ000020480408
  • IFS Code: BARB0KALWAX
  • Name of Bank: Bank Of Baroda
  • Name of Branch: Kalwa West
  • Bill Amount:50,890.00
Disclaimer: Please use above bank details only for payment against consumer number mentioned in beneficiary account number.








HT image

Important Message









CURRENT CONSUMPTION DETAILS
Reading Date KWH KVAH RKVAH (LAG) RKVAH (LEAD) KW (MD) KVA (MD)
Current 31-05-2025 49017.500 49811.000 0.500 7396.000 12.120 12.160
Previous 30-04-2025 46484.000 47245.500 0.500 7062.000
Difference 2533.500 2565.500 0.000 334.000
Multiplying Factor 1.000 1.000 1.000 1.000 1.000 1.000
Consumption 2534.000 2566.000 0.000 334.000 12.000 12.000
LT Metering 0.000 0.000 0.000 0.000 0.000 0.000
Adjustment 0.000 0.000 0.000 0.000
Assessed Consump 0.000 0.000 0.000 0.000 0.000
Total Consumption 2534.000 2566.000 0.000 334.000 12.000 12.000









BILLING DETAILS
Billed Demand (KVA) 13 @ Rs. 517
Assessed P.F. Avg. P.F. 0.990
Billed P.F. 0.990 L.F.
Consumption Type Units Rate Charges Rs.
Industrial 0 0.00 00.00
Residential 0 0.00 0.00
Commercial 2,534 13.01 32967.34
E.D. on(Rs) Rate % Amount Rs.
0.00 0 0.00
0.00 0 0.00
42,744.82 21 8976.41
TOD Zone Rate Units Demand Charges Rs.
2200 Hrs-0600 Hrs -01.50 475 3.00 -712.50  
0600 Hrs-0900 Hrs & 1200 Hrs-1800 Hrs 00.00 1183 11.00 0.00
0900 Hrs - 1200 Hrs 00.80 535 12.00 428.00
1800 Hrs-2200 Hrs 01.10 342 9.00 376.20
Amount in Words FIFTY THOUSAND EIGHT HUNDRED NINETY ONLY
Demand Charges 6,721.00
Wheeling Charge @ 01.17   2,964.78
Energy Charges 32,967.34
TOD Tariff EC 91.70
FAC @ 00.00  Ps/U 00.00
Electricity Duty ( 21.00 %)   8,976.41
other charges 00.00
Tax on Sale @ 19.04  Ps/U 482.47
P.F. Penal Charges/P.F. Inc. -1,068.62
Charges For Excess Demand 00.00
Incr Consumption Rebate -648.00
   
Debit Bill Adjustment 00.00
TOTAL CURRENT BILL 50,490.00
Current Interest  06-06-2025 00.00
Principle Arrears 396.25
Interest Arrears 02.61
Total Bill (Rounded) Rs. 50,890.00
Delayed Payment Charges Rs. 639.19
Amount Payable30-06-2025  After
Amount Rounded to Nearest Rs.(10/-)
51,530.00


Message:
Message: Please refer copy of the bill for details./
# Prompt Payment Discount: Rs. , if bill is paid on or before .






CONDITIONS
2. The current bill is payable within fifteen days from the date of issue of the bill. Even if there is any discrepancy in the bill or any other clarification needed, consumers are requested to pay the billed amount in full provisionally or under protest subject to review and subsequent adjustment, so that payment of delayed payment charges is avoided.
4. Please quote the Consumer Number on the back of the Cheque. The payment of this bill should be made at Company's office only.
5. If the cheque is sent by post, the same should be posted three clear days in advance of the due date.
6. If the amount is paid by cheque/DD, the date on which the amount gets cleared, or a maximum of 3 days from the date of depositing the cheque will be considered as the bill payment date.
Collection Hours : 10-30 to 16-00 Hours ( Except on Bank Holidays, Sundays, 2nd and 4th Saturdays)
Follow us at: Facebook Page Link Tweeter Page Link Youtube Channel Link Instagram Page Link